Electric Arc Furnace Off Gas System Design
Electric Arc Furnace Off Gas System Design
New EAF Off-Gas System

Electric Arc Furnace Off-Gas System Design

Client: Nucor Steel

Location: Memphis, TN

Preliminary and Detail Design of a New Off-Gas System for a new Electric Arc Furnace Meltshop.

  • EAF Primary and Secondary Fume Collection Design including LMF and Caster Canopy Fume collection
  • 1,200,000 ACFM Reverse Air Baghouse Design
  • Optimized EAF canopy hood storage volume through Computational Fluid dynamic (CFD) modeling
  • Detail Engineering—Process, mechanical, and structural
  • Equipment Sizing, Specification Development
  • Total Drawings: 128
  • Commissioning and Performance Testing
Project History

Basic Engineering
Detail Engineering
Startup

January 2007
March 2007
April 2008