Electric Smelting Furnace Off Gas System Design
Relocated Baghouse in Operation
Electric Smelting Furnace Off Gas System Design
New Baghouse During Construction

Electric Smelting Furnace Off-Gas System Design

Client: Glencore

Location: Dominican Republic

Preliminary and Detail Design and Commissioning of a New Off-Gas System for 2 Electric Smelting Furnaces.

  • Primary and Secondary Fume Collection Design
  • Two 124,000 ACFM Pulse Jet Baghouse—1 Relocated Baghouse and 1 New Baghouse
  • Detail Engineering – Process, mechanical, and civil/structural
  • Equipment Sizing, Specification Preparation, and Bid Evaluation
  • Total Drawings: 50
  • Commissioning and Performance Testing
Project History

Basic Engineering
Detail Engineering
Startup
Hot Commissioning

May 1998
May 2002
July 2005
July 2005

Anode Furnace Arsenic Emissions ReductionTankhouse Acid Mist Control Conceptual Engineering