Karara Iron Ore Project

Client: Karara Mining Ltd

Location: Western Australia

Conceptual and Basic Engineering for Material Handling System Dust Control Systems for Greenfield Iron Ore Mine.

Project Work Includes:
  • Development of dust control systems for crushers, screens, conveyors, transfer points, and storage facilities.
  • Develop options to:
    • Minimize dust emissions
    • Minimize worker exposure to emissions in enclosed spaces
  • Work Included:
    • Capital cost and operating cost estimates
    • PFDs / PIDs
    • Major equipment specifications and data sheets
    • Coordination of layout drawings in 3D
Karara Iron Ore Projec
Project History

Conceptual Study
Feasibility Engineering

May 2010
Oct 2010

Re-Heat Furnace Waste Heat Recovery SystemHIsmelt Fume Extraction System Upgrades