New 4LTPA Smelter Expansion

Client: Sterlite Copper

Location: India

Basic and Detailed Engineering for new 400,000 TPA Smelter Expansion Including Peirce Smith Converter and Anode Vessel Design, Converter Primary and Secondary Hood Design, and Anode Matte Tap Hood Design.

  • New P.S. Converter and Anode Vessel Design
  • Converter Primary and Secondary Hood Design
  • Detail Engineering—Process, mechanical, civil/structural and electrical/instrumentation
  • Equipment Sizing, Specification Preparation, and Bid Evaluation
  • Total Drawings: 110
Project History

Basic Engineering
Detailed Engineering

July 2010
December 2010

New 4LTPA Smelter Expansion
Process Gas Handling System Upgrade Detail DesignAnode Furnace Arsenic Emissions Reduction