Rotary Kiln 1 Off-Gas 2nd Scrubber Addition

Client: BHP Billiton Cerro Matoso

Location: Colombia

Conceptual Study, Basic and Detailed Engineering to Upgrade Kiln 1 off-gas system capacity by adding a 2nd wet scrubber.

  • System capacity increase evaluation
  • Evaluate options for providing increased capacity and improved dust removal performance:
    • Modify or replace existing scrubber
    • Addition of 2nd scrubber
Rotary Kiln 1 Off Gas 2nd Scrubber Addition
New Rotary Kiln 2nd Scrubber System
Project History

Conceptual Study
Basic/Detailed Engineering

April 1998
February 2000

Tankhouse Acid Mist Control Conceptual EngineeringElectric Smelting Furnace Off Gas System Design