Rotary Kiln 4 Off-Gas Upgrade Study and Basic Design

Client: PT Vale

Location: Indonesia

Conceptual Study and Basic Engineering to Upgrade Kiln 4 ESP system to meet 50 mg/Nm3.

  • System capacity increase evaluation
  • Evaluate impact of multiple fuel and reductant options
  • Evaluate options for providing increased capacity and improved dust removal performance:
    • Modify or replace existing multiclone
    • Modify or replace existing ESP
    • Build in current location or adjacent
Rotary Kiln 4 Off Gas Upgrade Study and Basic Design
New Rotary Kiln ESP System
Project History

Scoping Study
Basic Design

September 2013
December 2013

Electric Smelting Furnace Off Gas System DesignCopper Smelter Emissions Reduction Study