Anode Furnace Off-Gas System Conceptual Engineering

Client: Atlantic Copper
Location: Huelva, Spain

Conceptual engineering study for a new off-gas system for the anode furnaces. The work included assessment of existing operating issues, evaluation of ventilation and capture efficiency, and preliminary designs to improve environmental performance and reliability. Options considered included new hooding arrangements, duct routing, and integration with existing gas cleaning equipment.

Key Objectives Included:

  • Identify operational constraints in the current anode furnace off-gas system
  • Develop conceptual design options for improved capture and control
  • Evaluate integration with existing gas cleaning units
  • Provide high-level CAPEX and OPEX estimates
  • Support client decision-making for next phase engineering
Project History
Conceptual engineering study 2014