EAF Off-Gas System Modifications Engineering

Client: ArcelorMittal Dofasco
Location: Hamilton, ON Canada

Engineering modifications to convert EAF primary off-gas cooling system to full evaporative cooling.

  • Process design basis and control philosophy
  • Equipment specification and sizing
  • Commissioning and startup services
  • Reduced operating and maintenance costs
Project History
Study Complete August 2014; Detailed Engineering February 2015; Startup December 2015