Electric Arc Furnace Off-Gas System Design

Client: Nucor-Yamato Steel
Location: Blytheville, AR

  • Preliminary and Detail Design of a new EAF canopy baghouse system
  • EAF secondary fume collection design
  • 1,300,000 ACFM reverse air baghouse
  • CFD modeling to optimize canopy hood design
  • Detail engineering for process, mechanical, civil, structural, electrical & instrumentation
  • Construction underway with target startup Fall 2009
Project History
Basic Engineering November 2006 Detail Engineering August 2008