Client: Nucor Steel
Location: Jewett, TX
Preliminary, detail design, and commissioning for a new EAF off-gas system.
- EAF primary and secondary fume collection (LMF & caster canopy)
- 1,680,000 ACFM reverse air baghouse
- CFD modeling for optimized canopy hood and meltshop design
- Process, mechanical, and electrical detail engineering
- Commissioning and performance testing
Basic Engineering March 2002; Detail Engineering June 2002; Startup May 2004; Hot Commissioning July 2004