Client: Nucor Steel
Location: Memphis, TN
Preliminary and detail design of a new off-gas system for a greenfield EAF meltshop.
- EAF primary and secondary fume collection design
- 1,200,000 ACFM reverse air baghouse
- CFD modeling to optimize canopy hood storage volume
- Process, mechanical, and structural detail engineering
Basic Engineering January 2007; Detail Engineering March 2007; Startup April 2008