Client: BHP Billiton—Cerro Matoso
Location: Colombia
- Preliminary & Basic Engineering of a new off-gas system for Electric Smelting Furnace #1 and #2
- Primary & secondary fume collection design
- Expanded secondary baghouse (double capacity)
- Equipment sizing, specification, and bid evaluation
- Commissioning and performance testing
Preliminary Engineering EF#2 March 2006
Gas Analysis Testing EF#2 June 2006
Basic Engineering EF#2 June 2007
Commissioning EF#2 Aug 2008
Basic Engineering EF#1 Aug 2009
Detail Engineering EF#1 Dec 2010