Hood Design and Supply

Client: Codelco Caletones
Location: Chile

  • Design and supply of a new water-cooled primary hood system for a Peirce-Smith Converter
  • Optimize hood using CFD modeling
  • Closed loop cooling water circuit design
  • Equipment supply (hood, door and winch, back flap, pumps, heat exchanger)
Project History
Basic and Detail Engineering April 2013 Anticipated Start-Up November 2014