Hood Design and Supply

Client: Grupo Mexico ASARCO
Location: Hayden, Arizona

Design and supply of three new water-cooled primary hoods and three new secondary hoods for Peirce-Smith Converters.

Key Project Elements:

  • Design new water-cooled primary hoods
  • Design new secondary hoods
  • Optimize hood design using CFD modeling
  • Design of new closed-loop cooling water circuit

Equipment Supply Includes:

  • Water-cooled primary hood
  • Secondary hood
Project History
Process Gas Evaluation 2009 Conceptual Engineering 2010 Basic Engineering 2010 Detailed Engineering & Supply 2016-2017 Startup 2018