Integrated Steel Mill Energy Footprint Optimization

Client: ArcelorMittal Dofasco
Location: Hamilton, ON Canada

  • Study to evaluate overall site energy usage
  • Predict future plant energy footprint for multiple production scenarios
  • Develop interactive model to minimize purchased fuel and flare
  • Optimize steam system, identify projects to reduce external fuel consumption
  • Project economics (CAPEX, OPEX, ROI)
Project History
(Study only; no specific dates provided)