Meltshop Air Pollution Control System Basic Engineering

Client: Evraz
Location: Claymont, DE

  • Basic Engineering to finalize design and specs of meltshop modifications
  • Baghouse sizing, structural analysis, equipment performance specs
  • Master schedule, cost estimate (+/-20%), constructability review
  • Bid package for EPC contractors
Project History
Study Complete September 2010 Basic Engineering December 2010 New Off-Gas System Optimization June 2013