Meltshop Fume Collection System Study 2 (Gerdau MACSTEEL: Jackson, MI)

Client: Gerdau MACSTEEL
Location: Jackson, MI

Basic and Detailed Engineering to maintain EPA opacity compliance while operating furnaces in the existing meltshop.

  • Implement draft control on both EAFs
  • Modify building roof vents and partition EAF aisle
  • Baghouse upgrades (fan, motor, duct, new bags, etc.)
Project History
Study Complete July, 2008 Basic Engineering April, 2009 Detail Engineering April, 2010