Basic and Detailed Engineering for a new 400,000 TPA smelter expansion. Includes Peirce Smith Converter and Anode Vessel design, plus primary/secondary hood design.
Converter and Anode Vessel design
Hood design (primary/secondary)
Equipment sizing, specification, bid evaluations
Total Drawings: 110
Project History
Basic Engineering July 2010
Detailed Engineering December 2010