New Electrolytic Lead Refinery Pre-Feasibility

Client: Met-Mex Penoles, S.A. de. C.V.
Location: Torréon, Mexico

Pre-Feasibility Engineering for a new greenfield electrolytic lead refinery (99.99% pure product). Project work includes process design basis, mass/energy balances, environmental controls, and equipment sizing/layout.

Project History
Pre-Feasibility Engineering January 2012