Precious Metals Recovery Plant

Client: Fujairah Gold
Location: United Arab Emirates

Development of a functional control description for the new TROF Converter Ventilation System at Fujairah Gold�s Precious Metals Recovery Plant. The scope addressed relocation and modification of equipment from Sterlite India to improve performance and worker safety.

Key Objectives Included:

  • Integration of a new enclosure and optimized hooding for improved primary and secondary emissions capture
  • Design and control logic for baghouse, induced draft fan, and DynaWave wet scrubber system
  • Conversion of the scrubber reagent system from lime to caustic with updated operating philosophy
  • Draft and damper control strategy to balance gas flows across primary and secondary systems
  • Recommendations for data logging, alarm setpoints, and commissioning adjustments
Project History
Functional control description and design support 2012