Installation of an Organic Rankine Cycle (ORC) system on a reheat furnace for waste heat recovery (up to 0.6 MW). Included direct heat exchange ORC, cooling system design, layout, and ductwork optimization.
Construction in 17 months (ARO)
Zero reported incidents
Commissioned January 2013
Project History
Conceptual Engineering 2010
Basic & Detailed Engineering 2011 - 2012
Procurement & Construction 2012
Start-up Jan 2013