Rotary Kiln-4 Off-Gas Upgrade Study and Basic-Design

Client: PT Vale
Location: Indonesia

Conceptual Study and Basic Engineering to upgrade Kiln 4 ESP to meet 50 mg/Nm³. Evaluated system capacity, multiple fuel/reductant options, and location constraints (existing vs. adjacent).

Project History
Scoping Study September 2013 Basic Design December 2013