Client: Grupo Mexico Metalurgica de Cobre
Location: La Caridad, Nacozari, Mexico
Establish an Environmental Management and Implementation Program to reduce roofline and stack emissions of SO2 and particulate.
Scope Includes:
- Development of a 5-year master plan for staged implementation
- Measure and define roofline and stack emissions rates from each process
- Identify high-priority areas to address emissions
- Develop options for reducing emissions from high-priority areas
- Benchmarking of emissions rates for similar smelting operations
- Order-of-magnitude capital cost estimate for each option
- Converter and Teniente primary and secondary hood improvements
- New closed-loop hood cooling water system design
- New anode furnace off-gas system design
Testing and Studies 2012-2015
Anode Furnace Off-Gas System Design 2012-2017
Converter 1° Hood Cooling System Design 2013-2014
Teniente 2° and Tapping Hood Design 2013-2014