Client: Aditya Birla – Hindalco Copper
Location: Gujarat, India
Development of recommendations and staged implementation strategy to achieve world-class environmental targets for Smelter I.
Study Work Includes:
- Stack and roofline fugitive emissions testing for SO2 and particulate matter to establish baseline for existing emissions characteristics
- Evaluate various improvements to the smelter and PMR primary and secondary off-gas systems
- Develop order-of-magnitude capital and operating cost estimates
- Develop preliminary process flow diagrams and GAs for recommended modifications
- Develop a 5-year master plan for phased implementation to meet emissions targets
Basic Engineering Work Includes:
- Design of new baghouse system with hydrated lime injection
- Design of new hydrogen peroxide-based wet scrubber
- Design of reagent unloading, handling, and distribution systems
- Design of dust handling and recycle systems